London North West University Healthcare NHS Trust (LNWH) has appointed Keysource to undertake a live upgrade of the data centre at Ealing Hospital. It follows an extensive review of the mechanical and electrical infrastructure during which Keysource determined how best to solve the complex challenge of lifecycle replacement within a live environment, that needed to be more efficient and support the need for increased capacity.
Keysource will redesign the existing space and create a modular solution to provide flexibility for LNWH that can expand with their future requirements in increments in clear capacity steps across both the mechanical and electrical equipment.
Another key benefit is that this will result in the freeing up of plant rooms, through the relocation of all critical infrastructure within the data centre, creating valuable space within the hospital, whilst improving the resilience.
The works will include the deployment of a new Modular UPS System N+1 with 10 Minutes autonomy with External Maintenance Bypass and a Close Coupled cooling system N+1. This will be undertaken in a live environment with no downtime expected to existing services.